Product Details:
|
|
Place of Origin: | China |
---|---|
Brand Name: | SUNYO |
Certification: | SGS, Sira, CE certificates |
Model Number: | S300 |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1000PCS |
Price: | Negotiable |
Packaging Details: | 15PCS/CTN, 1000CTNS/20FT CONTAINER |
Delivery Time: | 5-7 work days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 200000PCS/Month |
Detail Information |
|||
Type: | One Component,sealant | Main Raw Material: | Polyurethane |
---|---|---|---|
Mf: | Mixture | Other Names: | Polyurethane Foam,polyurethane Sealant,PU FOAM |
Color: | White Or As Your Request | Application: | Sealing Construction,Gap Filling,sealing The Gaps,GP |
Shelf Life: | 12 Months | Packing: | 750ml /pc,can |
High Light: | expanding polyurethane foam sealant,expanding foam sealant |
Product Description
Wholesale Rigid Polyurethane Expanding Spray Foam for Installation and Insulation
Application:
One-component polyurethane foam is used preferably for thermal insulation and installation applications in the construction. It is ideal for bonding, fixing, installation, sound insulation, heat preservation, heat insulation, sealing and moisture-proof, filling structural gaps and various cracks.
Overview:
We welcome and support to customize various colors, packing and brands.
Technical Parameters:
Density | >14kg/m3 | Solvent resistance | -30~80 degree |
Max yield | 40L/750ML | Aging resistance | >15 years keep out of sun |
Tensile strength | >80KPa | Thermal conductivity | <0.05W/(m·K) |
Shear strength | >98KPa | Surface drying time | 10~15mins |
Fire rated | B3 | Compressive strength | >100KPa |
Features:
Operation Steps:
1. Shake can evenly for 2. Clean and wet the surface. 3. Turn the bottle upside down
one minute before use. to connect spray gun, and turn
on the flow valve and adjust
the flow.minute before use.
4. Use from the bottom up, 5. After ten minutes, the foam 6. Use a knife to smooth
spray amount is required to starts to cure, and after one cured foam and treat surface
fill the volume of 1/2. hour, the next step can be with cement, paint and so on.
carried out.
Production:
Enter Your Message